Pool Committee
Hire the pool manager,
approve hiring of pool staff,
set wages,
work with pool manager in organizing and prepping the pool for the season,
help with operation of the mechanical systems of the pool.
In the spring
pump out the water in the pool and
pressure wash and acid clean pool proper before filling,
fill the pool with water and start the pool circulation system and pool heater system,
wash off the pool parking lot,
put up sunshades,
set up outdoor sound system,
pressure wash the inside of the change house,
install gutter drain covers,
put up sunshades.
During pool operation
repair any equipment that doesn't need a specialist to repair,
After the pool is closed for the season
turn off pool heaters and
shut off natural gas to heaters and domestic hot water heater,
drain the pool and all piping systems,
pressure wash the empty the pool,
put carpet down the slope to the deep end so cats that get into the pool in the winter can get out,
close bottom drain valve,
open gutter valve,
After fall cleaning
fill pool with 4 feet of water for the winter,
drain and blow out the pool water piping systems, domestic and lawn sprinkler system with the city compressor,
put snow fence up around the pool to help keep leaves out of the pool,
pull pool gutter grates and store in change house, rake and remove leaves from the snow fence and pool one or two times in the fall,
move chemicals and equipment that can't freeze from change house and garage to the garage at the city office,
pull light bulb from the flag pool spot light,
take down sound system speakers and store in office.
Turn off water to the pool at the water meter.
Open valve near the outside spigot to drain main line to building.
Open valve under metal cover just outside the east walk in gate to drain water line from pool house to the pool.
Open drain valve on deck near the diving board to drain the return line from bottom of the pool and gutters.
Last updated
Was this helpful?